Material Field

FREE MATERIAL ESTIMATOR

Asphalt Tonnage Calculator

Convert paving dimensions into compacted hot-mix asphalt tonnage for a supplier request.

Project measurements

Request plant tonnage

Give the plant the mix, compacted thickness, calculated tons, and waste allowance so it can confirm load sizing.

Continue planning

Asphalt Cost Calculator

How the calculation works

We use 145.2 lb/ft³ FHWA planning value.

Formula: length × width × compacted depth × 145.2 lb/ft³ ÷ 2,000

Worked example

A 50 × 20 ft mat at 2 in compacted depth is about 13.3 tons with 10% waste.

Enter compacted mat dimensions

Measure each paving rectangle and use the designed compacted lift thickness; calculate irregular areas separately.

Frequently asked questions

What density does this tonnage estimate use?

It uses 145.2 lb/ft³ as a published planning value for hot asphalt mix.

Should separate lifts be combined?

Calculate each lift at its compacted thickness, then add the tonnage before applying order constraints.

Sources and assumptions

FHWA Federal Lands unit-weight guidance for hot asphalt mix.

Last reviewed: August 14, 2026. Read the methodology and sources.